We’re thrilled to announce that the Rigid Strander in Lebanon has officially begun load testing! This milestone marks a significant step forward in our Cable Production project, and we couldn’t be prouder of the collaborative efforts that made it possible.
订阅:
博文评论 (Atom)
🎥 3600 Drum Twister in Operation
Now running smoothly at the customer’s site—delivering stable, high-torque performance for large cable production. Reliable, efficient, and ...
.jpg)
-
The drum twister from us adopts sub-motor driving mode, with the following features: 1. The main components of the equipment have high prec...
-
July 1 5th , 2017, LINT TOP sent professional technical staff s to the factory inspection. The export of the product i s punching bobb...
-
Extruder sent to Ecuador, S outh America,has been installed successfully South America customer is a regular customer of LINTTOP and ...
没有评论:
发表评论